Most lots in Guanacaste's developments are sold inside a condominium. That brings a second set of rules on top of the municipality's, and a design committee that approves the house before anyone else does.
Reviewed October 2026. General information, not legal advice: rules change, and each municipality applies them its own way.
(The law)
A condominium is shared property with its own rules
Under Costa Rica's condominium law, Ley 7933, each owner holds a finca filial, a lot or unit for independent use, and a share of the common areas: the internal roads, the wells and tanks, the water treatment plant and the green areas. Those common areas cannot be divided and are paid for by the owners, whether they use them or not 1.
That is the main difference with an urbanization, where the streets and parks are handed over to public use 11. In a condominium the roads, the green areas and the wastewater plant stay private and are kept up with the owners' fees 1,2.
Whoever buys is bound by the condominium's rules, the reglamento de condominio y administración, and is deemed to know the monthly fee 1,2. Since 19 January 2026 the law's regulation is Decreto 45214, which replaced the 2005 decree that many guides still quote 2.
(The rules)
What the rules control
The law lets each condominium decide whether owners may change facades, forms or colours away from the whole 1. The condominium's approved plans fix, lot by lot, the maximum coverage, the height in storeys and the buildable area 2. Setbacks are the stricter of two: the cantonal plan regulador or the national construction rules, or the condominium's own, if it asks for more 2. Near rivers and springs the forestry law's protection strips apply as well 9.
Developments add their design guidelines. Two published ones, side by side:
| Rule | Península Papagayo [7] | Nativa Resort, Garabito [8] |
|---|---|---|
| Height | 10 m; up to 14 m with a variance | 3 storeys, 2 above the street; 14 m |
| Coverage | 30% at most | Set by the registered site plan |
| Setbacks | Set lot by lot on its diagram | 3 or 5 m by lot type; 7 m on the main road |
| Smallest house | 140 to 372 m², by lot type | 150 m² |
| Roof | Eaves of 1.5 m or more; no Spanish tile, asphalt shingles or gravel | No Spanish tile |
| Colour | Earth tones from the site, limits on brightness | Approved in writing by the committee |
| Lighting | Shielded LED, no up-lighting, limits on light levels | Not stated |
| Work hours | 7:00 to 17:30, Monday to Saturday | No Sundays or holidays without approval |
Most guidelines also cover landscape (native plants from an approved list), walls and gates, pools, noise from equipment, construction fences and contractor rules 7,8.
(Approvals)
Two approvals: the condominium's and the State's
- (01)
Read before you buy
The reglamento, the design guidelines and the condominium's approved plans with the area table for your lot. They bind you from the day you buy 1,2.
- (02)
Concept review
Most committees start with a meeting and a concept or schematic review. In Península Papagayo a schematic approval lasts one year 7.
- (03)
Final design approval
Península Papagayo requires it before the ICT, the CFIA platform and the municipal permit 7; Nativa stamps the plans before they go to any institution 8.
- (04)
CFIA and institutional review
The drawings are filed in the CFIA's APC platform, where the national institutions review them 3.
- (05)
Municipal permit
No national rule requires a letter from the condominium 1,2,3,4, but some municipalities do: Escazú asks for the written authorization of the condominium's administration or board 5, and Heredia for its approval of the project 6.
- (06)
Building under the condominium's rules
Deposits, approved contractors, inspections at set stages and working hours 7,8.
- (07)
Completion
The committee inspects and issues its own certificate of completion; in Península Papagayo, the Certificate of Completion and Occupancy 7.
(Costs)
What it costs beyond the house
The monthly fee is approved by the owners' assembly 2. Unpaid fees become a lien on the lot that ranks just behind property tax, and the seller must hand the notary a certificate that fees are paid; otherwise the buyer becomes liable for them 1.
Review fees and deposits vary by development. Península Papagayo publishes its own: US$2,000 for the schematic review and US$2,000 for the final review, a compliance deposit of US$20,000 to US$50,000 depending on the size of the house, and a US$25,000 utility connection fee, plus tax 7.
(Before you buy)
Five checks before buying a lot
- Ask whether the lot is titled or held under a concession. Lots in the maritime zone and in the Golfo de Papagayo tourism pole are concessions, and the ICT adds a layer of approvals 2.
- Get water availability in writing: from AyA, the local ASADA or a well concession. Without it there is no building permit 4. In 2026 a condominium in Nosara was reported with homes built without permits or proof of water 10.
- Find out who maintains the roads, the green areas and the treatment plant, and how much of the fee goes to them 1,2.
- Check the setbacks on your lot against the plan regulador, the national rules, the condominium's rules and any river or spring nearby, and design to the strictest 2,9.
- Note how long each approval lasts and how long the condominium gives you to build: Nativa allows 18 months from groundbreaking 8.
Rules can change: changing the reglamento takes two thirds of the owners by value under the 2022 reform of the law, although another article still speaks of unanimity, so ask a lawyer before counting on a change 1.
(Questions)
Do I need the condominium's approval to get a building permit?
Who decides what my house can look like?
What setbacks apply inside a condominium?
The larger of the plan regulador or national construction rules and the condominium's own. No front setback is required on internal roads 2.
Is a lot in Península Papagayo titled?
No. It is held under a concession granted by the ICT, under a master declaration of covenants and restrictions 7.
(Sources)
- Ley 7933, Ley Reguladora de la Propiedad en Condominio (current text, version of 16 March 2026). SINALEVI, Procuraduría General de la República, 2026.
- Decreto Ejecutivo 45214-MIVAH-MEIC-TUR, Reglamento a la Ley Reguladora de la Propiedad en Condominio (in force 19 January 2026). SINALEVI, 2025.
- Decreto Ejecutivo 36550, Reglamento para el trámite de revisión de los planos para la construcción. SINALEVI, 2021.
- Reglamento de Construcciones. INVU, via SINALEVI, current.
- Requisitos para licencia de obra mayor por APC. Municipalidad de Escazú, January 2026.
- Permisos de construcción, obra mayor. Municipalidad de Heredia, September 2026.
- Península Papagayo Master Design Guidelines. Península Papagayo, November 2023.
- Nativa Resort architectural guidelines. Nativa Resort & Condominiums, July 2024.
- Ley Forestal 7575, article 33, protected areas. SINALEVI, current.
- Mar Azul condominium in Nosara built with irregularities. La Voz de Guanacaste, 3 July 2026.
- Reglamento de Fraccionamiento y Urbanizaciones. INVU, via SINALEVI, 2019, current version 2026.